Channar
|
Location |
20km from the Paraburdoo mine |
|---|---|
|
Operation |
Open pit with site-based processing facilities. Ore from Channar passes through two stages of crushing before being conveyed to the Paraburdoo central plant for further processing. |
|
Working arrangements |
Employees live in nearby Paraburdoo |
|
Capacity |
11 million tonnes per annum of crusher feed (total capacity of Greater Paraburdoo operation is 23 mtpa - Paraburdoo, Eastern Range and Channar) |
|
Products |
Secondary crushed material conveyed to Paraburdoo |
|
Geology |
Brockman Bedded Iron Deposit |
|
First year of operation |
1990 |
|
Ownership |
Joint venture between Hamersley Iron (60 per cent) and Sinosteel Corporation (40 per cent). |
|
Assets |
Shared from the Greater Paraburdoo operations pooled fleet: Auxillary Equipment Drill: Grader: Front End Loader: Articulated Truck: Float: Tyre Dozer: |
|
Local government |
Shire of Ashburton www.ashburton.wa.gov.au |
Latest media releases
- 21 May 2013
Rio Tinto welcomes first resident into new Jingarri Estate in Karratha - 07 May 2013
Rio Tinto welcomes first Aboriginal trainee's transition to permanent Emergency Management position in the Pilbara - 06 May 2013
New bridge approved on the North West Coastal Highway near Roebourne supports Rio Tinto Pilbara expansion