Hope Downs
| Location | 100 kilometres north-west of Newman, Western Australia. |
|---|---|
| Operation | Open pit operation with site-based processing facilities. |
| Working arrangements | Fly-in / fly-out roster. |
| Capacity | 30 million tonnes per annum. |
| Products | Pilbara Blend Lump and Fines. |
| Geology | Marra Mamba Bedded Iron Deposit. |
| First year of operation | 2007 |
| Ownership | 50:50 Unincorporated Joint Venture between Rio Tinto and Hancock Prospecting Pty Limited. |
| Assets |
Loading Equipment: Haul Trucks: Auxiliary Equipment: Crushing and screening plant - 30 million tonnes per annum (North and South combined). Train loadout capability - 125Kt per day. |
| Power supply | Power supplied from the Rio Tinto power network. |
| Local government | Shire of East Pilbara http://www.eastpilbara.wa.gov.au/ |
Latest media releases
- 08 March 2010
Rio Tinto rail manager Kellie Parker's outstanding achievement - 30 December 2009
Rio Tinto's Yandicoogina becomes first mine in Australia to produce 50 million tonnes a year - 18 December 2009
Rio Tinto awards 200 million mining contract to indigenous joint venture
