Mesa J

Location 200 kilometres south west of Karratha
Operation Open pit operation with site-based processing and train loading facilities
Working arrangements Employees are residential and live in nearby Pannawonica
Capacity 7 million tonnes per annum
Products Robe Valley pisolite ore 
Geology Channel Iron Deposit
First year of operation 1992
Ownership Mesa J is owned by Robe River Iron Associates of which Rio Tinto has a 53 per cent operating interest.
Assets

Dozers:
• Komatsu WD900
• D10R, D10T

Dump Trucks:
• Cat 785C, 789C

Excavators:
• Hitachi, EX450, EX1900, EX3600

Graders:
• Cat 16H, 24H

Loaders: 
• Komatsu WA500, WA900, WA1200
• Cat 926, 928, 950, 992G

Water Truck:
• Cat 777

Drills:
• DM-M3, Pit Viper

Local government  Shire of Ashburton http://www.ashburton.wa.gov.au/