Paraburdoo
| Location | 80 kilometres south of Tom Price. |
|---|---|
| Operation | Open pit operation with site-based processing facilities. |
| Working arrangements | Employees live in nearby Paraburdoo. |
| Capacity | 20 million tonnes per annum (total Greater Paraburdoo Operation - Paraburdoo, Eastern Range and Channar). |
| Products | Lump and Fines contributions to Pilbara Blend. |
| Geology | Brockman Bedded Iron Deposit. |
| First year of operation | 1972 |
| Ownership | 100 per cent Rio Tinto. |
| Assets |
Shared from the Greater Paraburdoo Operations pooled fleet: Auxillary Equipment Drill Grader Front End Ldr Articulated Truck Float Tyre Dozer Crushing and screening plant, fines processing plant. Train loadout capability. |
| Local government | Shire of Ashburton http://www.ashburton.wa.gov.au/ |
Latest media releases
- 30 August 2010
Rio Tinto approves US$1.6 billion investment in Hope Downs 4 mine - 04 August 2010
Rio Tinto to invest additional US$790 million in expansion of Pilbara capacity to 330 Mtpa - 03 August 2010
Rio Tinto to invest US$170m for the next stage of the Simandou iron ore project in Guinea